We painted just about all of the interior walls and baseboards before we moved in; the only ones we didn't paint are the bathroom and bedroom in the basement. Once the weather warms up we plan on taking all the doors off the frames and painting them as well. Hero replaced the locks on the exterior doors. In November, Hero replaced the kitchen sink faucet and installed the remote control for the garbage disposal. In recent weeks Hero has begun to replace light fixtures. He replaced the light fixture on the back patio with a motion sensored light, the two lights on the garage with motion sensored lights. He is working on the front porch light, but he needs to get some wood to finish that one because the sensor light doesn't fit properly against the house. (I'll get pictures of the front outside lights when he is done with that.)
Then this weekend he replaced the light above my kitchen sink and the light in my kitchen. I wish I had taken a picture of the light in the kitchen before he took it down. It was just your standard fluorescent light, only we broke the cover when we painted. The light cover cracked when we took it down to paint and then someone stepped on it, making it impossible to hang back up.
Next month we hope to begin changing all the rest of the lights....Hero says they are easy to change out. We would like to put a ceiling fan in our room and possibly the family room, then there is the chandalier to replace in the dining room. The more expensive lights like those may take us a few months to change.
Once the lights are all changed the next big project is to order shutters and have them installed.
Once the lights are all changed the next big project is to order shutters and have them installed.

1 comment:
like the new light
Post a Comment